ISRO

The Indian Space Research Organisation (ISRO) is India’s national space agency, responsible for building and launching the country’s satellites, launch vehicles and interplanetary probes, and for turning the data they return into services for weather forecasting, communications, disaster management and national security. It was established in August 1969 and works under the Department of Space, which was constituted in 1972; its headquarters is Antariksh Bhavan in Bengaluru.[1] 

How the organisation is built

ISRO is not a single campus but a federation of centres, each owning a slice of the programme. Vikram Sarabhai Space Centre in Thiruvananthapuram builds launch vehicles; U R Rao Satellite Centre in Bengaluru builds spacecraft; the Liquid Propulsion Systems Centre develops engines; the Space Applications Centre in Ahmedabad makes payloads; the National Remote Sensing Centre in Hyderabad processes Earth observation data; ISTRAC tracks and controls satellites; and the Satish Dhawan Space Centre at Sriharikota launches them. The Human Space Flight Centre, set up for Gaganyaan, and the ISRO Inertial Systems Unit are part of the same structure.[2] 

The Department of Space’s mandate runs wider than exploration: an indigenous launch capability, the INSAT programme for telecommunications, broadcasting and meteorology, a remote sensing programme for development applications, and research in space science and technology. That combination — building the rocket, the satellite and the downstream application under one roof — is the distinguishing feature of the Indian model, and the reason a weather satellite or a navigation constellation reaches farmers and fishermen rather than stopping at the launch pad.[3] 

ISRO’s reputation rests less on doing things first than on doing them at a fraction of what they cost elsewhere — a constraint that has shaped its engineering culture as much as any policy document.

The recent record

The last three years have been the busiest in the agency’s history. Chandrayaan-3, launched on 14 July 2023, made a soft landing near the Moon’s south polar region on 23 August 2023 — the first anywhere in that region, and the fourth national soft landing on the Moon — and its instruments confirmed sulphur in the lunar soil by direct elemental analysis. Aditya-L1, launched on 2 September 2023, became India’s first solar observatory when it was inserted into a halo orbit around the Sun–Earth L1 point on 6 January 2024, about 1.5 million km from Earth.[4][5] 

The agency has also moved into domains it had not attempted before. XPoSat, launched on 1 January 2024, was India’s first dedicated X-ray polarimetry mission. SpaDeX, launched on 30 December 2024, demonstrated autonomous docking and undocking in orbit, making India the fourth country to master the technology — a prerequisite for assembling a space station and for sample-return missions. GSAT-7R/CMS-03, launched in November 2025, is the Navy’s newest military communications satellite.[6] 

NISAR, launched on GSLV-F16 on 30 July 2025, is the most visible product of international partnership: the first dual-frequency L- and S-band radar Earth observation satellite, built jointly with NASA, with NASA supplying the L-band payload and ISRO the S-band, and both now operational and returning data.[7][8] 

The 2026 campaign

ISRO opened 2026 with PSLV-C62 carrying EOS-N1 on 12 January, followed GSLV-F17 and EOS-05 on 4 September, and closed the autumn with GSLV-F18 and the navigation satellite NVS-03 on 30 October. EOS-05 was the more consequential of the three: a 2,367 kg spacecraft and the heaviest payload GSLV has injected, it is India’s first dedicated imaging satellite operating from geosynchronous orbit, able to revisit parts of the country every few minutes and cover the entire landmass roughly every half hour at about 42 m resolution. It restores a capability lost in August 2021, when the cryogenic upper stage of GSLV-F10 failed to ignite and EOS-03 was lost.[9][10] 

After that launch the chairman set out a target of six more launches in the financial year, mixing PSLV, SSLV and private-sector flights, and put the number of space startups in India at around 440 — a measure of how far the sector has moved beyond a single government agency.[11] 

Human spaceflight

Gaganyaan is the programme everything else is now being sequenced around. The launch vehicle has been human-rated and around 8,000 tests have been completed; three uncrewed flights are to fly before any crew does, and the first of them, Gaganyaan-1, has been targeted for the current year. India has already put a citizen on the International Space Station by another route: Group Captain Shubhanshu Shukla flew on Axiom Mission 4 in 2025 and conducted seven microgravity experiments, giving ISRO first-hand experience of crewed operations, training and emergency response.[12][13] 

Money and infrastructure

The Department of Space has a budget of ₹13,705.63 crore for 2026–27, split between revenue expenditure of ₹7,329.71 crore and capital expenditure of ₹6,375.92 crore. That is a modest figure by the standards of the agencies ISRO is compared with, and it is routinely described as insufficient for the mission list the agency has committed to — a gap that has become more pointed as Gaganyaan, lunar sample return and a national space station all compete for the same funds.[14][15] 

Infrastructure is expanding to match. A second spaceport is under construction at Kulasekarapattinam in Tamil Nadu’s Thoothukudi district, on land the state government acquired and handed over — about 2,300 acres — after the foundation stone was laid in February 2024. The first launch from the new pad is expected in March or April 2027. The facility will be government-owned and operated, with private contractors handling operations and maintenance, and is intended chiefly for the small solid-propellant vehicles that cannot easily be flown from Sriharikota.[16][17] 

What comes next

The queue is long. Chandrayaan-4, a lunar sample-return mission, is scheduled for implementation in 2028, and Chandrayaan-5 or LUPEX — a joint mission with Japan to explore water and volatiles in the permanently shadowed regions near the lunar south pole — is intended to demonstrate a higher-capacity lander. Two more second-generation navigation satellites, NVS-04 and NVS-05, are to complete the NavIC constellation. Beyond that sits the Bharatiya Antariksha Station and, eventually, an Indian crewed lunar landing, both of which depend on Gaganyaan delivering a working human-rated capsule first.[18][19] 

What holds the programme together is less any single mission than the accumulated habit of doing difficult things on tight budgets: a south-polar lunar landing, a solar observatory parked at L1, a docking experiment in low Earth orbit, and now a crewed capsule. Whether that model stretches to a space station is the open question of the next decade.[20] 

Report Image

Please specify the reason for reporting this image (e.g. copyright violation, inappropriate content).

Image Details & Licensing

Media Preview
Author:
Source:
License:
Uploaded By:
File Type:
View Original

Article Revision History

Please Login to join the discussion.